To maintain operation of substations during or immediately after a major flood event, an important design measure is to raise all critical equipment above the Design Flood Elevation (DFE). This can be easier said than done.
For greenfield installations, this might require raising the substation site, potentially requiring substantial amounts of fill. This solution may not be ideal, as it could increase the flood risk for adjacent properties. Alternatively, elevating equipment on taller supports may be a prudent solution. Either of these approaches could introduce additional costs to a project. However, it is important to keep in mind the resulting benefits in reliability and risk reduction. Depending on what design phase the project is in, it might even be prudent to consider an alternative site in a lower-risk area that may have lower overall costs once flood mitigation measures are factored in.
For brownfield installations, raising critical equipment above the DFE can be accomplished through retrofits of existing structures.
Beyond adjusting the elevation of facilities due to flood risk, utilities should consider designing for conditions associated with floods, such as buoyancy loads, hydrostatic and hydrodynamic loads, debris impact, soil instability and scour, as well as other local considerations. These can have a significant effect on the structural design, and in-depth knowledge of these effects is needed to determine the appropriate design criteria and methods.
For installations that are in need of retrofit but have not been addressed yet, temporary flood barriers have been successfully used by utilities for rapid response to flooding events.