Burns & McDonnell Logo white Burns & McDonnell Logo white
Contact Us

Menu

Our family of brands

Stay in touch with the things that matter most

Subscribe  

Burns & McDonnell Logo white

Main sections

Contact Us

What You Should Know When Planning Gas-Insulated Substations

Summary

Please join us for a live webinar discussing the features and benefits of gas-insulated substations (GIS), versus air-insulated substations (AIS).

Though a GIS has higher upfront costs, it can be built on a smaller footprint, with lower operating and maintenance costs, and delivers enhanced safety features. In this webinar, you will learn about planning criteria that should be evaluated when considering a GIS or AIS, either as a new substation or an end-of-life replacement. We will also present some case studies of projects where a GIS solution was deemed most suitable.

Speakers

Janson Ferrera

T&D Projects Manager

Connect on LinkedIn

Janson oversees a portfolio of transmission, substation and distribution projects with a focus on risk, scope and financial performance. He has extensive experience on greenfield and brownfield substation projects ranging from 345-kV to distribution voltages.

Dan Song

Substation Design Lead

Based in Calgary, Dan has more than 30 years’ experience in design and management of engineering teams, supporting high-voltage substation project development and execution.

On Demand

 

Making Our Clients Successful

Contact Us  

Accessibility

Privacy Statement

Ethics & Compliance

Manage Email Preferences

LinkedIn LinkedIn Facebook Facebook Instagram Instagram X (formerly Twitter) X (formerly Twitter) Youtube YouTube

© 2025 Burns & McDonnell. All rights reserved.

At this time, Burns & McDonnell is not offering pure architectural services in the states of Illinois, Montana, New Hampshire or New Jersey. We may, however, provide design-build services for architectural projects.