Systemwide Assessment and Testing
With a regular, planned program of preventive testing and assessment, plant operators can get ahead of the “break/fix” curve by feeding these results into an asset management database that carefully tracks the current and projected condition of every component within the electrical system.
Transformers, for example, that are within five years of the end of their expected 20- to 30-year design lives can be taken out and replaced during the next scheduled plant shutdown. With a proactive look at which breaker may be in danger of overloading, or which transformer is showing trouble signs, parts can be ordered on a regular schedule without rush charges, to be installed by plant facilities and maintenance on a regular schedule. Emergency response is sometimes necessary but should not be a routine part of standard procedure for your industrial plant. Paying premium rates for dozens of technicians to arrive at your plant within 30-60 minutes is a cost you can plan to avoid.