Solution
The utility chose to implement the improvements using a progressive design-build project delivery approach, which integrates design and construction to create a single point of accountability, which saves time and money. This mode of delivery was ideal because the District’s team wanted to partner with a firm that could handle both design and construction to avoid risk gaps. The drivers behind the decision to utilize design-build delivery included:
- Collaboration: The utility preferred a collaborative approach that would allow it to provide input into various elements of the project, including treatment process selection and equipment selection.
- Speed: The District’s compliance schedule could not be achieved with traditional design-bid-build delivery.
- Value: The utility wanted to select the team that provided the highest overall value, as measured by its qualifications, including a combination of cost and non-cost factors.
- Innovation and Creative Technical Solution: The District knew that the most effective solution would involve an innovative combination of treatment processes.
Updating an existing wastewater plant to reduce TDS is a challenging problem. The District selected a joint venture of Burns & McDonnell and Garney Construction in a competitive progressive design-build procurement process because of the companies’ shared and individual experience in wastewater treatment, potable water treatment, membrane applications and progressive design-build delivery.
The team started preliminary design in October 2019 and broke ground on this $45 million improvements project in January 2021. Slated for completion in 2023, the project will provide a sustainable reduction in TDS to bring the facility into compliance with its discharge permit.
At the outset, our team studied the facility and the underlying process issues. After examining piloting data, it was clear that TDS reduction could be achieved with a reverse osmosis (RO) treatment application added after the existing sequencing batch reactor (SBR) process.
Following the current SBR process — in which wastewater is treated by a sequencing batch reactor, then discharged to an equalization tank — it was noted that the water quality coming off the equalization tank of the SBR system would require multiple steps of filtration before it would be suitable as RO feed water.
Our team explored the option of tertiary filtration followed by microfiltration after the SBR. We also reviewed the alternative of changing the secondary process to a membrane bioreactor (MBR) so that no additional filtration would be needed. The option of converting SBRs to MBRs was selected based on the merits of reducing treatment steps, simplifying operations and reducing costs.
The MBR process requires less secondary process volume, which allows the entire treatment to occur in two of the existing four process trains. A high-recovery RO (HRRO) system was also explored in place of traditional RO. The HRRO has a recovery rate above 90%, which allows for the use of evaporation ponds for brine disposal rather than the higher-risk option of deep well injection.