Maximize Performance With Modernized Control Systems

CREATING OPERATIONAL EFFICIENCIES WITH PROACTIVE PROJECT CONTROLS

Today’s developers of hydroelectric power plants have the potential to create operational efficiencies during construction that earlier generations could scarcely imagine. Proactive project control systems that address management of documents, risks, costs, schedule and changes are central to their success.

READ WHITE PAPER

MODERNIZING A LINCHPIN IN NEW YORK’S CLEAN ENERGY GOALS

Since it opened in 1961, the Robert Moses Niagara Power Plant has provided a significant baseload supply of clean energy to New York. To maintain performance, reduce failure risks and maximize access to plant data, NYPA has begun the largest single investment in its history to modernize and upgrade the hydropower plant’s control and electrical protection systems.

 

READ THE PROJECT PROFILE

STANDARDIZING A MODERN CONTROL SYSTEM FOR RELIABLE GENERATION

In need of a consistent control system platform, El Paso Electric set out to upgrade several of its units and sites with a modernized solution. The system allows the utility to increase service reliability and operational efficiency.

READ THE CASE STUDY

SOMETHING OLD, SOMETHING NEW; SOMETHING BOLD BECOMING TRUE

Integrating new capabilities into legacy systems can involve untangling complex interactions, but utilities stand to benefit from an incremental approach.

VISIT BENCHMARK TO READ THE ARTICLE

WHEN OLD MEETS NEW: MODERNIZING A COLORADO HYDROELECTRIC PLANT

When Xcel Energy’s Cabin Creek Generating Station came online more than 50 years ago, the hydroelectric plant was a marvel of engineering nestled in the Rocky Mountains. The facility remains critical to Colorado’s electric grid today, driving an innovative face-lift to allow operations to continue reliably for decades to come.

READ THE PROJECT PROFILE

DETERMINING THE RIGHT TIME TO UPGRADE

Newer distributed control systems (DCS) have features to optimize safety, performance, controllability and reliability. Upgrading to use these enhanced features and mitigate the risks of an aging DCS is a decision that requires proper planning and justification. A thorough control system assessment evaluates the risks and analyzes the potential benefits.

READ THE WHITE PAPER

AUTOMATED FOR EFFICIENCY

Two reciprocating engine generation facilities in remote areas of Michigan’s Upper Peninsula are models of savings and efficiency for the power industry.

VISIT BENCHMARK TO READ THE ARTICLE

CONSIDERATIONS FOR UPGRADING AND REPLACING TRANSFORMERS AT HYDROELECTRIC GENERATION FACILITIES

Transformer failures can cause extended facility downtime, lost revenue, and unexpected large capital expenses for the hydroelectric power generation industry. A proactive approach can help in assessing existing transformer condition as well as predicting and planning for impending failures.

READ THE WHITE PAPER

MASTERING VOLTAGE REGULATION FOR RELIABLE POWER

Using a new piece of logic within distribution control systems, power plants can further automate their voltage output, building efficiencies into systems and avoiding a NERC VAR-002 violation.

READ THE BLOG

BREATHE NEW LIFE INTO AGING HYDROELECTRIC PLANTS

Upgrading older hydroelectric plants can lead to costly changes and scheduling delays. Mitigate these issues with front-end planning for electrical and mechanical equipment replacements and surrounding auxiliary modifications.

READ THE BLOG

Jonathan Grantham

Business Development Manager
 Connect on LinkedIn

Send Us a Note