Seeing Expansion Potential in a Place Where Waters Are Rising
With bustling retail and residential growth in South Boston, it was time for a new substation. Because the area is on the waterfront where sea levels are expected to rise, the utility had to overcome the complications of building within a flood plain. Read the case study about how Eversource Energy’s Station 99 could be a model for other coastal construction.
![](http://info.burnsmcd.com/hs-fs/hubfs/Collateral/Case%20Studies/Creating-Resilient-Power-In-Flood-Prone-Area-case-study-burns-mcdonnell-04845_Page_1.jpg?width=150&name=Creating-Resilient-Power-In-Flood-Prone-Area-case-study-burns-mcdonnell-04845_Page_1.jpg)