Developing a Common Picture and Goal
Identifying a preferred pipeline corridor often starts with a desktop review of the physical environment and real estate properties that lie along the route. Though this is a preliminary step that requires subsequent on-site inspections and surveys, a detailed routing study can help identify fatal flaws with the selected route, such as restricted access corridors from state transportation departments, significant historical or cultural sites, areas with potential environmental contamination, or special land use protections.
These studies provide the supporting data that will be needed to obtain rights-of-way and easements as well as to identify the purchase options that will be needed to acquire land, or even to defend a condemnation action if that becomes necessary. The data provided by the study also supports the work of the engineering staff as they develop project boundaries and design various scope packages.
Because permissions to access properties vary by state, documenting special provisions that may require access is an especially important step. On-site visits are key actions that can help surface landowner requests or concerns, which can be more easily accommodated at an early design stage. Not only will this save costs, but it can also help identify and avoid any potential impasses that could delay or even force a project to follow a more costly route. By obtaining as much early information as possible, the land team can serve as a valuable liaison between project stakeholders — from property and project owners, to the engineering, legal and procurement professionals. This common operational picture and early engagement can be key to minimizing any hiccups down the road that may require a costly new design or more property acquisitions.
The ROW team sets out immediately to obtain as much information as possible that can assist with the design and placement of both below-ground pipeline infrastructure and above-ground assets such as valves, meter and regulation facilities, and pump or compressor stations. Information on locations where horizontal directional drilling (HDD) may be required to go under roadways, railroads, waterways or other obstacles also may be obtained during this stage.
Determining the final scope of a project is a key goal of the preliminary stages. Though starting and end points are often defined by the owner prior to engagement of outside professionals, the finer details like associated facilities, trenchless crossings, access roads or laydown yards are often not clearly identified and can be pinpointed during early phases. This scoping effort should include conforming schedules across project disciplines to include various phases of engineering design, right-of-way acquisition schedules, permitting required by jurisdictional siting boards as well as major environmental and other permits. Schedules should factor in a reasonable window for any needed property acquisitions and include requirements for any condemnation proceedings that may be required.
All these factors will drive construction start dates.