Results
With upfront planning and regular communication among project team members and interested parties, the Delta Terminal C project was designed and constructed within a constrained site footprint, and phased to maintain Delta Air Lines and LGA operations. However, the project achieved more. The project delivered a new terminal complex that improved passenger processing, airfield efficiency and long-term operational flexibility.
The new Terminal C features 37 aircraft gates connected by a centralized terminal headhouse for streamlined efficiency. The headhouse includes a check-in lobby, security checkpoint, baggage claim, administrative offices and conferencing space. Airfield efficiency improved with dual taxi lanes added between concourses to minimize time between the gate and takeoff or landing.
Passenger experience and accessibility were also central to the terminal’s design. Improvements included enhanced curbside operations and direct garage access, a multisensory room for passengers on the autism spectrum, hearing loop systems at gates, and a new Delta Sky Club with expanded food and beverage offerings.
The project exceeded its original sustainability requirements, achieving LEED Gold certification. Energy performance surpassed baseline requirements by more than 6%, supported by efficient lighting, envelope design, mechanical systems and an ice storage system that shifts cooling demand to off-peak hours. Water use was reduced by more than 45% through highly efficient plumbing fixtures. Overall, the terminal was designed and executed to maximize operational efficiency and sustainability through a range of integrated strategies, including:
- Energy-efficient HVAC, plumbing and lighting systems, supported by an ice storage system that uses off-peak power to produce approximately 110,000 gallons of ice for summer cooling demand.
- Daylight-responsive controls, including sensors that adjust electric lighting levels and automated window tinting based on sunlight, weather and time of day.
- Stormwater management systems designed to capture and treat approximately 90% of average annual rainfall and remove 80% of post-development suspended solids.
- Landscape and water efficiency measures, including elimination of permanent irrigation and reduced interior water use through high-efficiency fixtures.
- Construction waste diversion and material sourcing, achieving 90% diversion from landfills, use of recycled and regional materials, and incorporation of FSC-certified wood.
- Infrastructure to support electrified ground operations, including charging for electric ground support equipment.
The terminal opened in 2022. In 2024, LaGuardia Airport received the Airport Service Quality Award for best North American airport serving 25 to 40 million passengers, based on passenger satisfaction surveys conducted by Airports Council International. LaGuardia also earned recognition from Forbes Travel Guide as the best airport in the United States. Through disciplined planning, phased execution and sustained coordination, the team maintained airport operations while delivering a resilient, high-performance terminal on a tightly constrained, flood-exposed site.