SOLUTION
Three scenarios were all considered feasible for TruStile: a solution that suggested the continued disposal of all sawdust byproducts; the installation of a biomass boiler to combust all sawdust byproducts for only heating the new facility; and the installation of a biomass boiler to combust all sawdust byproducts for both heating and cooling of the new facility.
Understanding the environmental impacts of each of these scenarios would help the company make an informed decision about which to construct.
Our team was retained to perform the environmental impact studies for each design scenario. An initial site visit was conducted to meet with TruStile staff to better understand its manufacturing process and desires for the project. Through this site visit and additional meetings, the varying options for the utilization or disposal of the sawdust byproduct at the new facility were determined.
We then performed an analysis to calculate the environmental impacts of each option. These impacts were presented to TruStile, allowing the company to weigh its options and choose the most effective design for the new facility in terms of environmental impacts and economics.