Chicago’s Midway International Airport (MDW) has seen significant growth and evolution since it opened in 1927. In the early 2000s, MDW completed a large expansion, which included a new central heating and refrigeration plant (CHRP) to satisfy the increased cooling and heating needs of the new concourses.
The initial operations at the CHRP were designed to balance fluctuating electrical rates in the Illinois power market. Today, there is little differential between peak and off -peak electrical rates, meaning the original configuration of the CHRP was no longer fiscally efficient.
In 2018, MDW began an airport modernization project to add a new Transportation Security Administration area that bridges over Cicero Avenue. This expansion required additional cooling capacity, which the initial CHRP did not have the excess capacity to provide. Therefore, the Chicago Department of Aviation (CDA) decided to upgrade the CHRP as part of this modernization project. This would allow the CHRP operations to better utilize the current lower electrical rate structure and upgrade key systems with modern technologies.