The Burns & McDonnell team was engaged as the designer of record to Hill Mechanical Group for this design-build project, responsible for completing the mechanical, electrical and structural engineering for the CHRP upgrade and other major tasks:
- Upgrade the CHRP by adding new chillers in a series arrangement to the two existing chillers to maintain 36°F water supply to the airport.
- Upgrade air handling units by replacing the existing supply and return fan inlet guide vanes, to be replaced with new variable frequency with new variable frequency drive (VFDs) and VFD rated motors.
- Upgrade the fire protection in three computer re-equipment rooms, removing the existing water-based system and replacing with a new gas-based system.
- Convert approximately 700 variable air volume (VAV) boxes from pneumatic controls to electric direct digital controls (DDCs).
- Replace 43 glycol water-based preconditioned air units with larger, 30-ton direct expansion (DX) units.
- Upgrade the lighting control panels at 28 areas to newer units.