AN INTEGRATED EPC SOLUTION GENERATES RELIABLE AND CLEAN POWER
To boost reliable and clean power availability, Competitive Power Ventures (CPV) set its sights on a dual-fuel, 680-megawatt combined-cycle generation facility in New York’s Hudson Valley. As a partner in a joint venture, our team helped use integrated EPC services to deliver the project capable of providing more than 600,000 homes with electricity.
PROJECT STATS
Client
Competitive Power Ventures LLC
Location
Wawayanda, New York
Commercial Operation
May 2018
CHALLENGE
Competitive Power Ventures (CPV), a leading independent power producer, was in search of adding capacity and reliability to the New York Independent System Operator (NYISO) to replace retiring generation in the Hudson Valley region. After evaluating potential generation options, CPV selected a 680-megawatt (MW) combined-cycle facility design to service the area’s more than 600,000 residential homes with efficient, reliable and clean power — while reducing carbon emissions to help meet the state’s 80 percent reduction goal by 2050.
MORE THAN
BEING SUPPLIED WITH
RELIABLE POWER
600K
HOMES CAPABLE OFBEING SUPPLIED WITH
RELIABLE POWER
MORE THAN
ANNUAL REDUCTION
IN CARBON EMISSIONS
500K
TONS (ESTIMATED) OFANNUAL REDUCTION
IN CARBON EMISSIONS
MORE THAN
COMBUSTION TURBINE
GENERATORS
2
SIEMENS SGT6-5000FCOMBUSTION TURBINE
GENERATORS
SOLUTION
CPV contracted a joint venture with Burns & McDonnell, Skanska USA Civil Northeast and ECCO III Enterprises for engineer-procure-construct (EPC) services on the combined-cycle CPV Valley Energy Center in Wawayanda, New York.
Maintaining close collaboration with CPV and all parties, our team provided engineering, procurement, construction, and commissioning and startup services for the dual-fuel plant. CPV Valley Energy Center incorporates two Siemens SGT6-5000F combustion turbine generators matched with two supplementary-fired heat recovery generators (HRSGs) with kettle-boiler type rotor air coolers. The design also features three SGen6-1000A generators, one Siemens SST6-5000-KN side exhaust condensing steam turbine generator and a 36-cell induced draft air-cooled condenser.
To deliver reliability and maximize efficiency, each combustion turbine is designed to be capable of operating at full load in a pseudo simple-cycle mode, in which steam from the corresponding HRSG bypasses the steam turbine and is bypassed to the condenser. Through the commissioning process, our team utilized the facility’s backup supply of ultra-low-sulfur diesel (ULSD) fuel for startup while a pipeline was completed to deliver the plant’s primary fuel source, natural gas. This dual-fuel flexibility increases CPV Valley Energy Center’s availability during cold weather peak demands, when gas supplies may be curtailed to industrial customers.
The teams also incorporated design features to reduce the facility’s impact on the environment, including the use of reclaimed water from a nearby wastewater treatment plant as a source of make-up water for power production. The design allows process water, cooling water, boiler blowdown and wastes produced on-site to be discharged back to the wastewater treatment plant for re-treatment and reuse.
RESULT
CPV Valley Energy Center reached commercial operation in May 2018, enhancing the region’s electric system. The facility is forecasted to lower carbon emissions by an estimated 500,000 tons each year, according to the Brattle Group.